This project consists of a total land area of 2,877 Mu. Within the logistics center, functional area will be divided into seven operating zones which include port operation area, berth area ,warehouse and distribution area, cold chain logistics area, rail loading area, exhibition area and commercial zone.

  1.Cold Chain Logistics area occupied 226 Mu of land, built up with 2 multi-frozen warehouses, and 2 frozen food processing and packaging plants with a total construction area of 47,840 square meters, and the cold storage warehouse occupied a total area of 30,000 square meters. The designated logistics capacity of 60 million tons/year (annual processing capacity storage 300,000 tons), supported with parking area, roads, raw and auxiliary areas, water, electricity and other auxiliary production facilities, which equipped with appropriate equipment.

  2.Railway loading and unloading zone captured 310 Mu of land, including container yards, steel yard, railway junction, and other production facilities with efficient rail loading line of 1900 meters. The designated loading and unloading capacity reached 3 million tons/year, of which container 50000 TEU / year (including Reefer 20,000 TEU), heavy pieces of steel 1.5 million tons / year, general cargo 1 million tons / year, supported with constructed roads, parking lots, water, electricity and other auxiliary production facilities, which equipped with the appropriate equipment.

  3.Exhibition area conquered 497 Mu(331,333 square meter) of land, constructed with steel trading center, city supplies wholesale and retail commodity exhibition and trade center, Internet + logistics and corporate headquarters and other commercial facilities, with a total area of 357,200 square meters, supported with well developed roads, parking lots, water, electricity, and other auxiliary production facilities.

  4. Commercial zone covers 277 Mu(184,666 square meter) of land which includes commercial, apartment, banking, hotels, clubs and other services and leisure facilities in accordance with the Wuhan Yangtze River Newport logistics Center commercial requirements, with a total area of 352,500 square meters, supporting with constructed roads, parking lots, water supply, power supply, etc.

  5.Warehouse and distribution area covers 686 Mu(457,333 square meter), built up with two multistory warehouses, and 3 multi-functional warehouses with a total construction area of 140,650 square meters. The designated logistics capacity of over 6 million tons (annual storage capacity of 3 million tons), and the park constructed with container yard, parking lot and other production facilities such as roads, water, electricity and other auxiliary production facilities, which equipped with the appropriate equipment.

  6.Port operations area with an annual design throughput of 5 million tons, including container 100,000 TEU / year (including 2 freezers of 10,000 TEU), iron and steel weighs 1 million tons / year, general cargo weighs 3,000,000 tons / year. There are 881 Mu of land behind the port area, supporting the construction of container yard, yard for groceries, warehouse or groceries, multi-functional warehouse and production facilities such as roads, raw and auxiliary areas, gas stations, parking, water, electricity and other auxiliary production facilities equipped with appropriate equipment.

  7. Berth area with a coastline of 1,039 meters, built up with eight 5,000-tons berths of which 2 are multi-purpose berths, 6 miscellaneous berth.